Willmott Dixon
Approx £10million (total build value)
Following the successful delivery of the Kennedy Building in 2019, Willmott Dixon delivered a ‘first of its kind’ multi-use building featuring a 150-seat lecture theatre, seminar rooms, IT suites, social spaces and a GP simulation suite. Majenta was brought on board again as Information Manager, working successfully with some of the same project teams as before.
An expanding curriculum required a purpose-built space, the future maintenance of which depended on key information being accurately supplied to the FM team.
Building on previous success, Majenta worked alongside Willmott Dixon and their consultants to ensure the client deliverables were obtained and provided in the standards and methods the university required. Majenta worked with the university to ensure that they once again captured all of the FM team’s requirements for future building maintenance.
The university received a fully compliant model that contained all the required information for the FM team. The model had an integrated digital O&M manual which could easily be updated using access databases.
Gary Scott
Head of Digital Construction at Willmott Dixon London and South